Xiaoyi Xing'an Chemical Co., Ltd. #3 waste heat and waste pressure 12MW steam turbine generator set project
Xiaoyi Xing'an Chemical Co., Ltd. #3 waste heat and waste pressure 12MW steam turbine generator set project
Unit model B12-8.83/1.2//535 is a 12MW high-efficiency backpressure turbine generator set to replace the original temperature reduction and pressure reduction device, thereby generating energy saving and efficiency. It is responsible for the design, production, supporting and construction of the entire project, and is responsible for the EPC general contracting project. This project will obtain a bid notice on March 13, 2025. The design and production period is 165 days, and the installation and commissioning period is 30 days. It is planned to sign a contract on March 25, supply in mid-September, and complete in mid-October. This project adopts an efficient high-speed unit with a pressure level of 1+12, with an output speed of 6500r, which is reduced to 3000r through the gearbox, which is connected to the generator, public chassis, and external fuel tank. It is responsible for the installation of the main body of the steam engine. After the project construction is completed, it will generate huge economic benefits.