- The First Coal-Fired Power Project Approved Under Anhui Province’s 14th Five-Year Plan Has Officially Commenced Commercial Operations
- Party Group of the Shandong Energy Supervision Office of the Communist Party of China: Deeply promote the integrated construction of Shandong's power market
- State Power Investment Group holds a regular meeting on production and operation in March
- Focus | Electric Power Redemption and Transcendence on the Eve of Great Changes
Engineering case
China's top 500 Heze Fuhai Energy Development Co., Ltd. 20MW steam turbine flow structure technical transformation and efficiency improvement EMC project
After the renovation, the efficiency ratio will be increased by 11.32% under the same working conditions at full load; under the 80% load conditions, the energy-saving power will reach 1800kw/h, and the energy-saving economic benefits will not be less than 900 yuan per hour. Calculated for 8,000 hours of annual operation, the annual energy-saving economic benefits will reach 7.2 million yuan, and the total energy-saving efficiency will reach 36 million yuan in the five-year contract period. The direct and social benefits of the project are both significant.
At 15:08 pm on July 18, 2018, our company used a contract energy management benefit-sharing business model, and invested 7.5 million yuan in a comprehensive efficiency improvement project for the technical transformation of the 20MW extracted condensation steam turbine generator set, which was successfully started at one time and was connected to the grid to generate electricity.
- Previous:China Top 500 Luli Group Co., Ltd. 60MW double-cooling steam turbine generator set technical transformation and efficiency improvement technical service project
- Next:Dongying Xishui Group Thermal Power Co., Ltd. Energy-saving diagnostic service project for the back pressure variable working condition transformation of the extraction condensation 60MW steam turbine unit